Gas Transmission Capacities Utilization
as on June 30, 2018

S.# Transmission Network/Pipeline Available Capacity (mmscfd) Max Flow Passed (mmcfd) % age of Capacity Utilization Uncontracted Capacity (Utilizatoin)
A1 Indus Left Bank Pipeline System
16″ dia. x 290 Km (ILBP) Pipeline Nawabshah-Karachi Terminal 80
24″/20″ dia. x 412 Km KDN Pipeline Kadanwari-Malir-Karachi 180
24″ dia. x116 Km loopline from Sind University to FJFC Offtake 60
24″dia. x15 Km Masu-HQ3 40
24″dia. x84 Km HQ2-TandoAdam 85
18″ dia. x100 Km Badin Pipeline Badin-Hyderabad 200
24″ dia. x 34 Km Loopline from Tando Adam to Masu 23
Sub Total (A1) 668 817 122 0
A2 Indus Right Bank Pipeline System
20″/18″ dia. x250 Km IRBP Pipeline Dadu-Malir-Karachi 400
24″ dia. x200 Km Bajara-Karachi Loopline 240
Sub Total (A2) 640 274 43 366
A3 Quetta Pipeline System
A3-1 Capacity from Shikarpur to Quetta
12″/18″/20″ dia. x344 Km Quetta Pipeline Jacobabad-Quetta 90
18″ dia. x18 Km Abbe-gum to Mach Loopline 7
18″ x31 Km Dingra-Sibi, 18″ x15 Km Mach-Kolpur loopline 10
24″ x30 Km Loopline from Gokart to Abbegum 6
18″ x18 Km Loopline from Dhadar to Gokart 36
12″ x23 Km re-routing
24″x34 km Shikarpur to Jacobabad Loop Line
32
Sub Total (A3-1) 181 73 40 108
A3-2 Capacity from Zarghun to Quetta
12″x61 km Zarghun-Quetta pipeline Gas Project 25 15 60 10
Sub Total (A3) 206 88 43 118
A Total Capacities for SSGC (A1+A2+A3) 1514 1179 78 335
B Transmission Network Contracted (For SNGPL)
18″ dia. x40 Km Pirkoh Pipeline (OGDC) Pesh Bogi-Pirkoh 35
16″ dia. x58 Km ILBP (SNGPL) Hassan-Sui 30
20″ dia. x266 Km IRBP (Reverse Flow to SNGPL) Dadu-Sui 170
16″ ILBP reverse flow providing regulation between 20″ dia. IRBP & 16″ dia ILBP at RS1 10
Total Contracted Network (B) 245 50 20 195
C 42″x371 km CTS Bin Qasim to CTS Sawan RLNG-2 Pipeline* 1200 1143 95 57
SSGC Total Available Transmission Capacity (A+B+C) 2959 2372 80 587

Note:

  1. Capacities are subject to changes based on input/output pressures of the segment/transmission pipeline network.
  2. In order to calculate % age of capacity utilization, offtake date 27-12-2016 is considered.
  3. Utilization % age of each pipeline segments can not be calculated due to integrated transmission network and connection of more than one gas fields and gas sales meter station at a single line.
  4. * At present, up to 600 MMscfd RLNG is being received at CTS Bin Qasim against design capacity of 1200 MMscfd to be transported through 42′ x 371 km RLNG-2 dedicated pipeline from CTS Bin Qasim to CTS Sawan.

Updated: September 5, 2018