Go to Top

Company News

link icon

SSGC Dispatches Convoy of Relief Goods to Awaran

Recent earthquakes in Awaran district of Balochistan have left in its wake a trail of destruction, leaving many families displaced.A0A0 In keeping with the past tradition, SSGC, being a responsible 91Corporate Citizen92, arranged to dispatch theA0A0 relief goods to Read More

link icon

SSGC Customer Service

By: Syed Ovais Akhtar In these times of apathy and listlessness in most public sector utility organizations, it is really encouraging to see that SSGC offers customer services of a level above and beyond the norm. I had the occasion Read More

link icon

SSGC Intensifies Drive to Recover Outstanding Dues

Sui Southern Gas Company has launched an aggressive campaign to accelerate the pace of recovery of dues from defaulters in its franchise areas of Sindh and Balochistan. According to the sources in SSGC this has involved a vigorous advertising campaign Read More

link icon

Defaults by Large Consumers Affecting SSGC92s Operations

Karachi, September 18, 2013: Sui Southern Gas Company (SSGC) is facing great difficulties in recovering its dues from large gas consumers such as Karachi Electric Supply Company, Pakistan Steel Mills and others, which is negatively affecting the gas utility92s overall Read More

link icon

SSGC Offers Free, Environment-Friendly Paper Bags

SSGC Offers Free-of-Cost, Biodegradable, Environment-Friendly Paper Bags at Leading Shopping Stores for Public Consumption As a responsible citizen, Sui Southern Gas Company takes regular initiatives in its franchise areas of Sindh and Balochistan that benefit the communities at large, by Read More

link icon

SSGC Team Completes Hot Taps at Engro Fertilizer Plant Dharki

SSGC has safely and successfully completed two 16" dia Hot Taps on cooling water live lines on vertical bottle with Horizontal Drilling method and on horizontal pipe line with vertical drilling method at Engro Fertilizer Plants Dharki against service charges Read More

link icon

Intelligent Pigging of 16-inch dia ILBP Carried Out

The 347 mile long Indus Left Bank pipeline from Sui to Karachi was laid down in 1954 and commissioned in 1955. In those days intelligent pigging method was not developed and therefore this pipeline was non-pigable. In order to determine Read More