{"id":114782,"date":"2024-01-31T12:02:46","date_gmt":"2024-01-31T07:02:46","guid":{"rendered":"https:\/\/www.ssgc.com.pk\/web\/?p=114782"},"modified":"2024-01-31T12:02:46","modified_gmt":"2024-01-31T07:02:46","slug":"gas-pipeline-rehabilitation-works-in-full-throttle","status":"publish","type":"post","link":"https:\/\/www.ssgc.com.pk\/web\/?p=114782","title":{"rendered":"Gas pipeline rehabilitation works \u2013 In full  throttle"},"content":{"rendered":"<p>SSGC is undertaking diverse rehabilitation projects in its franchise areas to ensure optimum gas pressure and supplies.\u00a0 Already major projects have been commissioned.<\/p>\n<ul>\n<li>Rehabilitation of Distribution network has been completely re-strategized which has enhanced the rehabilitation capacity from <strong>~25 Km<\/strong> to <strong>~125 Km<\/strong> each month.<\/li>\n<li>As result of this enhanced focus, <strong>742 Km<\/strong> rehabilitation works have been completed in FY 2022-23 which is a record achievement.<\/li>\n<li>Achievement against the yearly rehabilitation targets remained <strong>96%<\/strong> (company-wide) with Karachi <strong>(97%),<\/strong> Interior Sindh <strong>(94%)<\/strong> and Balochistan <strong>(100%).<\/strong><\/li>\n<li>A mid-term plan is being chalked out, aiming to rehabilitate of around 4,500 Km distribution network in next 3 years.<\/li>\n<li>Execution phase started for around 800 KM network rehabilitation schemes in DHA Karachi in Phases I, II, V , VI &amp; VII. Rehabilitation works completed for Phase I and II with the final service installation in progress). Rehab works in Phase V and VII are expected to be completed soon.<\/li>\n<li>For UFG-targeted rehabilitation of Distribution pipelines, a contract for more than 500 Km of Distribution (DHA Phase VI &amp; VII) pipelines has been awarded to a PEC C-2 category level contractor whereas, remaining rehabilitation of Phase-V will be completed within the stipulated timeframe through in-house resources.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>SSGC is undertaking diverse rehabilitation projects in its franchise areas to ensure optimum gas pressure and supplies.\u00a0 Already major projects <a class=\"excerpt\" href=\"https:\/\/www.ssgc.com.pk\/web\/?p=114782\">Read More<\/a><\/p>\n","protected":false},"author":3,"featured_media":114783,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-114782","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.ssgc.com.pk\/web\/index.php?rest_route=\/wp\/v2\/posts\/114782","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ssgc.com.pk\/web\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ssgc.com.pk\/web\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ssgc.com.pk\/web\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ssgc.com.pk\/web\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=114782"}],"version-history":[{"count":1,"href":"https:\/\/www.ssgc.com.pk\/web\/index.php?rest_route=\/wp\/v2\/posts\/114782\/revisions"}],"predecessor-version":[{"id":114784,"href":"https:\/\/www.ssgc.com.pk\/web\/index.php?rest_route=\/wp\/v2\/posts\/114782\/revisions\/114784"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ssgc.com.pk\/web\/index.php?rest_route=\/wp\/v2\/media\/114783"}],"wp:attachment":[{"href":"https:\/\/www.ssgc.com.pk\/web\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=114782"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ssgc.com.pk\/web\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=114782"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ssgc.com.pk\/web\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=114782"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}