S.# Transmission Network/Pipeline Available Capacity (mmscfd) Max Flow Passed (mmcfd) % age of Capacity Utilization Uncontracted Capacity (Utilizatoin)
A1 Indus Left Bank Pipeline System
16″ dia. x 290 Km (ILBP) Pipeline Nawabshah-Karachi Terminal 80
24″/20″ dia. x 412 Km KDN Pipeline Kadanwari-Malir-Karachi 180
24″ dia. x116 Km loopline from Sind University to FJFC Offtake 60
24″dia. x15 Km Masu-HQ3 40
24″dia. x84 Km HQ2-TandoAdam 85
18″ dia. x100 Km Badin Pipeline Badin-Hyderabad 200
Sub Total (A1) 645 657 102 0
A2 Indus Right Bank Pipeline System
20″/18″ dia. x250 Km IRBP Pipeline Dadu-Malir-Karachi 400
24″ dia. x200 Km Bajara-Karachi Loopline 240
Sub Total (A2) 640 325 51 315
A3 Quetta Pipeline System
12″/18″/20″ dia. x344 Km Quetta Pipeline Jacobabad-Quetta 90
18″ dia. x18 Km Abbe-gum to Mach Loopline 7
18″ x31 Km Dingra-Sibi, 18″ x15 Km Mach-Kolpur loopline 10
24″ x30 Km Loopline from Gokart to Abbegum 6
18″ x18 Km Loopline from Dhadar to Gokart 36
12″ x61 Km Zarghun-Quetta pipeline Gas Project 25
Subtotal (A3) 174 141 81 33
Total Capacities for SSGC (A1+A2+A3) 1459 1123 77 336
B Transmission Network Contracted (For SNGPL)
18″ dia. x40 Km Pirkoh Pipeline (OGDC) Pesh Bogi-Pirkoh 35
16″ dia. x58 Km ILBP (SNGPL) Hassan-Sui 30
20″ dia. x266 Km IRBP (Reverse Flow to SNGPL) Dadu-Sui 170
16″ ILBP reverse flow providing regulation between 20″ dia. IRBP & 16″ dia ILBP at RS1 10
Total Contracted Network (B) 245 77 31 168
SSGC Total Available Transmission Network Capacity (A+B) 1704 1200 70 504
  • Capacities are subject to changes based on input/output pressures of the segment/transmission pipeline network.
  • In order to calculate % age of capacity utilization, Max Sale date 11-12-2015 is considered.
  • Utilization % age of each pipeline segments can not be calculated due to integrated transmission system and connection of more than one gas fields and gas sales meter station at a single line.