| S.# |
Transmission Network/Pipeline |
Available Capacity (mmscfd) |
Max Flow Passed (mmcfd) |
% of Capacity Utilization |
Uncontracted Capacity (Utilizatoin) |
| A1 |
Indus Left Bank Pipeline System |
|
|
|
|
| |
16" dia. Indus Left Bank Pipeline (ILBP) Nawabshah-Karachi Terminal |
80 |
- |
- |
- |
| |
24"/20" dia. Kadanwari Pipeline Kadanwari-Malir-Karachi |
180 |
- |
- |
- |
| |
24" dia. x116 Km loopline from Sind University to FJFC Offtake |
60 |
- |
- |
- |
| |
24"dia. x15 Km Masu-HQ3 |
40 |
- |
- |
- |
| |
24"dia. x84 Km HQ2-Shahdadpur |
85 |
- |
- |
- |
| |
18" dia. Badin Pipeline Badin-Hyderabad |
200 |
- |
- |
- |
| |
Sub Total (A1) |
645 |
490 |
76 |
155 |
| A2 |
Indus Right Bank Pipeline System |
|
|
|
|
| |
20"/18" dia. Indus Right Bank pipeline (IRBP) Dadu-Malir-Karachi |
400 |
- |
- |
- |
| |
24" dia. x200 Km Bajara-Karachi Loopline |
240 |
- |
- |
- |
| |
Sub Total (A2) |
640 |
528 |
83 |
112 |
| A3 |
Quetta Pipeline System |
|
|
|
|
|
12"/18"/20" dia. Quetta Pipeline Jacobabad-Quetta |
90 |
- |
- |
- |
|
18" dia. 18 Km abbe-gum to Mach Loopline |
7 |
- |
- |
- |
|
18" x31 Km Dingra-Sibi, 18" x15 Km Mach-Kolpur loopline |
10 |
- |
- |
- |
|
24" x30 Km Loopline from Gokart to Abbegum |
6 |
- |
- |
- |
|
18" x18 Km Loopline from Dhadar to Gokart |
36 |
- |
- |
- |
| |
Sub Total (A3) |
149 |
149 |
100 |
Nil |
|   |
Total Capacities for SSGC (A1+A2+A3) |
1434 |
1167 |
81 |
267 |
| |
|
| |
| B |
Transmission Network Contracted (For SNGPL) |
  |
  |
  |
  |
|
18" dia. Pirkoh Pipeline (OGDC) Pesh Bogi-Pirkoh |
35 |
- |
- |
- |
|
16" dia ILBP (SNGPL) Hassan-Sui |
30 |
- |
- |
- |
|
20" dia IRBP (Reverse Flow to SNGPL) Dadu-Sui |
170 |
- |
- |
- |
|
16" ILBP Reverse flow providing regulation between 20" dia. IRBP & 16" dia ILBP at RS1 |
10 |
- |
- |
- |
| Total Contracted Network - (B) |
245 |
223 |
91 |
22 |
| SSGC's Total Transmission Network Capacity (A+B) |
1,679 |
1,390 |
83 |
289 |