| You are here: Infrastructure / Gas Distribution |
 |
Gas Distribution Capacities as on December 31, 2009 |
| |
|
| |
| S.
No. |
Area |
Supply Main KM |
Design (MMCFD) |
Contracted (MMCFD) |
Uncontracted Capacity
(MMCFD) |
| 1. |
Karachi |
480 |
1,489 |
1,285 |
203 |
| 2. |
Interior Sindh |
3,250 |
663 |
290 |
373** |
| 3. |
Balochistan |
484 |
291 |
118 |
172*** |
| TOTAL
|
4,214 |
2,442 |
1,694 |
748 |
|
| |
|
| |
** Break-up of significant un-contracted capacities on following points is as follows: |
| |
|
| |
| SMS |
Dia |
MMCFD |
| 3rd SM Hyderabad |
|
44.8 |
| TPS Jamshoro |
16" |
40 |
| Nooriabad |
18"/16"/12" |
27.9 |
| Kotri New |
|
11.5 |
| TPS Kotri |
12" |
10 |
| Jacobabad |
6"/4" |
9.3 |
| Sukkur |
8" |
10 |
| Visco SIZ-Nawabshah |
8" |
8.5 |
|
| |
|
| |
Above
un-contracted capacity is also to be utilized for normal
growth in Sindh general Industries, Commercial and Domestic
Consumers. |
| |
|
| |
| ** |
1. |
Contracted capacity is based on winter load which
includes curtailment of HCPC/WAPDA during winter
season as well. |
| |
2. |
Un-contracted capacity is not available due to
related transmission pipelines constraint. |
|